Asbestos Removal South East 

Enquire now for information about our concrete cutting services across the London area.

Our Diamond Drilling and Sawing Division of Econ Construction Ltd is totally dedicated to providing you with an environmentally friendly and less aggressive alternative to the traditional methods of demolition.

Enquire now about our comprehensive concrete cutting service

With over 30 years of experience in the field, Econ has mastered the skill of providing safe and effective asbestos removal in South East England. Our comprehensive services and stringent standards ensure that every customer has a 5-star experience.

 

Complete Safety

 

Our asbestos removal teams undergo regular training sessions provided by the Asbestos Removal Contractors Association (ARCA) and UKATA approved training facilities. When it comes to hazardous waste removal we give utmost priority to safety, training and continuous development. Our teams are supervised by experienced professionals who have years of experience in conducting safe removal of all types of hazardous materials.

 

Private Waste Transfer Station

 

Unlike other companies that offer hazardous waste management services, we have our own transfer stations where the waste is securely stored before being shipped out for disposal. Our hazardous waste management stations are easily accessible from asbestos removal sites in South East England. Not only does this endure safety, but it also reduces the cost of waste disposal.

 

Asbestos Protection

 

Apart from asbestos removal, we also provide encapsulation services. This provides a cost-effective alternative for those who want to ensure protection against asbestos fibres. Encapsulation is an environmentally friendly process that requires lesser time and effort than asbestos removal while still protecting the site from asbestos fibres.

 

At Econ, we have formulated a five-step process that ensures complete customer satisfaction and effective asbestos removal in South East.

  • Survey The Site: We conduct a comprehensive survey to identify the site details, volume of materials and type of asbestos that needs to be removed.
  • Assess The Risks: The risk assessment expert draws up a report that provides exact details of the risks presented by the materials and the best methods for dealing with it.
  • Combat The Risks: In order to prevent airborne pollution, the asbestos is wet stripped and injected with a fibre suppressant that reduces the dust and debris.
  • Remove The Asbestos: The asbestos is safely removed and disposed of according to the guidelines set by the UN. The waste is clearly demarcated and efficiently disposed of.
  • Clear The Site: Once the asbestos has been cleared, UKAS accredited analytical laboratories conduct tests to ensure that the site is clear of all hazardous materials.

 

Right from conducting an initial survey of the removal and disposal of hazardous materials, we maintain the highest standards of safety and efficiency at every step of the way. Due to our stringent standards, we have always been granted the HSE’s maximum three-year asbestos removal licence.

Case Studies
Bridge Demolition - Abbey Wood

Econ was commissioned to demolish and clear a concrete footbridge spanning a four lane highway. Timing was critical to ensure that disruption to traffic and local residents was kept to a minimum.

READ MORE
Holland Lane East Bridge Demolition

Econ was called in to demolish the Holland Lane East road bridge, which passes over the railway tracks on the Oxted to Edenbridge line. Because of the need to minimise disruption to train services Econ were allowed a 52 hour window of access to the rail and road site and immediate surroundings.

READ MORE
Loaders Enabling Works, Silvertown

 Econ were contracted to carry out the complete enabling works package at Tate & Lyle, we carried out all the design works, service isolations and diversion, all surveys including Ground Radar & Demolition Asbestos Surveys

READ MORE
Coram Fields

What the client said:

“We found Econ to be talented and professional. We recently employed them to undertake some regeneration work to help us prepare for the building of our new Queen Elizabeth II Centre. Our experience of working with them was excellent. They were conscientious and efficient when working to a tight deadline and we have no hesitation recommending them for other projects.”

READ MORE
Woking Station Canopy

Econ were employed as a principle Contractor to plan, design and remove the canopy outside Woking Railway Station.

 

READ MORE
TFL Rolling Stock Disposal

Summary: Econ was retained to dismantle and dispose of redundant rolling stock for a number of TfL’s rail subsidiaries, as part of the company’s vital programme of network upgrading and modernisation.

READ MORE
The Grove School

 

Econ carried out the isolation and removal of all services, the removal of asbestos then the demolition and clearance of the complete site.

READ MORE
Harrow Manorway

Econ were contracted by FM Conway to carry out the design and demolition of Harrow Manorway footbridge in Thamesmead, South East London.

READ MORE
Licensable Asbestos Removal - Roof Void

What the client said:

"Professional, tidy and - what I like most - independent; we barely knew they were here."

READ MORE
Licensable Asbestos Removal - Toilet Block

Removal of sectional pipe insulation containing asbestos from a toilet block

READ MORE
Conway House

Econ Construction were commissioned to carry out the demolition of FM Conway’s former office in Dartford, Kent.

READ MORE
Bush Road Bridge

Econ were contracted to demolish the double span brick arch bridge

READ MORE
Northumberland Park Station - Network Rail

Econ were tasked with providing an anti-slip, hard wearing and waterproof coating to public high traffic walkways and refuge ramps.

READ MORE
Barking Riverside Extension Project

Removal of Asbestos and Disposal of Redundant Rolling Stock

READ MORE
Feltham Cycle Footbridge

Econ was employed on behalf of Network Rail for the dismantling of the ramp section and main span of the existing cycle footbridge in close proximity to Feltham railway station.

READ MORE
Redundant Electrical Sub-Station

Removal of asbestos and demolition of a redundant UKPN sub-station.

READ MORE
WHAT OUR CLIENTS SAY
We found Econ to be talented and professional. We recently employed them to undertake some regeneration work to help us prepare for the building of our new Queen Elizabeth II Centre. Our experience of working with them was excellent. They were conscientious and efficient when working to a tight deadline and we have no hesitation recommending them for other projects.
read more...
Coram
I have worked with Econ on many projects within London Underground and Network Rail infrastructure. Econ have always been very proactive in their approach to the projects and have worked collaboratively with my teams from the very early stages. I would definitely recommend them to others
read more...
Morgan Sindall
Also evident was the pride the staff have in what they do and the care they take to work safely at all times and offer the best service possible to their clients
read more...
BAE Systems
OUR CHARITY WORK

The Econ team is very active and always looking for ways to raise money for these excellent causes, fielding competitors in challenges such as the London Marathon, the London to Brighton Cycle race and the Killarney Adventure race!

Kent Website Design by SPLAT WEB WORKS