Job Profiles

Here are a few examples of projects we have won from some of our clients.

Project: Demolition of Brimsdown Signal Box  
Date: March 2009
Programme: 52 Hour Possession (Finished in 14 Hours)
Overview: To Demolish the Redundant Trackside Signal Box
The Job Sheet: Click here to Download the JobSheet PDF

 

Project: Dockside Crane Removal  
Date: September 2007
Programme: 1 Month
Overview: To remove, dismantle and recycle the dockside cranes to make way for the replacements.
The Job Sheet: Click here to Download the JobSheet PDF

 

Project: Footbridge At Borough Green Train Station         
Date: February 2007
Programme: 1 Month
Overview: To Remove and Crane out Concrete Footbridge
The Job Sheet: Click here to Download the JobSheet PDF

 

Project: A2 Footbridge Removal                 
Date: September 2006
Programme: 1 Night (Road Closure)
Overview: To remove, dismantle Midhurst Footbridge.
The Job Sheet: Click here to Download the JobSheet PDF

 

Project: Rail Vehicle Decontamination – Alstom Yard, Eastleigh       
Date: October/November 2005
Programme: Two Months
Overview: To remove asbestos from vehicles at Alstoms Yard in Eastleigh.
The Job Sheet: Click here to Download the JobSheet PDF

Project: Demolition of University Buildings              
Date: October 2008
Programme: 2 Months
Overview: To demolish University Blocks A,F,G,J & Q whilst the university was operational.
The Job Sheet: Click here to Download the JobSheet PDF