Job Profiles
Here are a few examples of recent projects.
| Projects: |
Lee Station |
| Date: |
1st Nov 2011 |
| Programme: |
Riser Wall Rebuild |
| Overview: |
We were called to attend a fault where the riser wall had spilt on the lower section along the courses of the wall. |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Farningham Road Station - Waiting Shelter Re-Build |
| Date: |
1st Nov 2011 |
| Programme: |
2 Weeks |
| Overview: |
The 2 main beams to the London End of the canopy had completely rotten through as they exit the station building roof, under the box gutter construction. The box gutter in the area that we had exposed had also rotted beyond any repair and required re |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
The Hastings Accademy |
| Date: |
6th Aug 2011 |
| Programme: |
Phase 1 – 10 Weeks - Phase 2 – 8 Weeks 2013 |
| Overview: |
To remove the Asbestos containing materials under semi, and fully |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Removal of Surrey Canal Road Footbridge |
| Date: |
16th May 2011 |
| Programme: |
10 Hours |
| Overview: |
Econ Construction Limited have gained a contract to carry out the demolition and |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
London Underground Mid Tunnel Ventilation Project – Redundant Vent Shaft Fan Dismantling & Removal |
| Date: |
16th Nov 2010 |
| Programme: |
3 Months |
| Overview: |
· Dismantling & Removal of All Redundant Plant including Fan, Controls and Ducting |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Tate & Lyle Europe – Building Deconstruction |
| Date: |
6th Aug 2010 |
| Programme: |
Four Weeks |
| Overview: |
Works were undertaken for Tate and Lyle Europe decommissioning redundant process building that was to be re modernised. |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Lineside Building & Sale Reel Warehouse Demolition Adjacent to Live Railway Line |
| Date: |
1st Jan 2010 |
| Programme: |
4 Months |
| Overview: |
To Demolish Line side Railway Building, and Adjacent Sale Reel Warehouse |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Redundant Pipe Removal Including Asbestos Lagged Pipework |
| Date: |
30th Jun 2009 |
| Programme: |
3 Months |
| Overview: |
To cut and remove redundant pipe work across the River Medway, to also decontaminate the asbestos lagged pipe work then cut and remove. |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Demolition of Brimsdown Signal Box |
| Date: |
20th May 2009 |
| Programme: |
52 Hour Possession (Finished in 14 Hours) |
| Overview: |
To Demolish the Redundant Trackside Signal Box |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Asbestos Removal From The Morgue at Queen Mary's Hospital Sidcup |
| Date: |
1st May 2009 |
| Programme: |
1 Week |
| Overview: |
To remove AIB ceiling refrigerator lobby and viewing room |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Clapham Common Vent Shaft Project |
| Date: |
1st May 2009 |
| Programme: |
3 Months |
| Overview: |
Asbestos Removal inc all Redundant Cable and Electrical Equipment |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|
| Projects: |
Access Stairs and Canopy Dismantle and Removal from Platform 11 & 12 at |
| Date: |
1st May 2009 |
| Programme: |
12 Hr Possesion |
| Overview: |
To remove the Asbestos Cement roof sheets, then hot cut and dismantle the |
| The Job Sheet: |
Click here to Download the JobSheet PDF |
|
|