CASE STUDY:

Holland Lane East Bridge Demolition

Services: Railway bridge demolition; waste and environmental management; concrete cutting and sawing

Project duration: 52 hour window of full access. Project completed after 27 hours

Summary: Econ was called in to demolish the Holland Lane East road bridge, which passes over the railway tracks on the Oxted to Edenbridge line. Because of the need to minimise disruption to train services Econ were allowed a 52 hour window of access to the rail and road site and immediate surroundings. Using a powerful mix of robotic excavators and traditional demolition excavators Econ were able to apply concentrated machine and manpower to complete the operation within the tight deadline. Concrete cutters and track saws were also employed along with a telescopic crane to remove materials quickly and safely for transportation to recycling plants.

Staffing requirements:  Military precision and planning was required to ensure that all works were handled safely and speedily to minimise disruption to rail services and the immediate areas surrounding the bridge. Staff employed on the project included: Network Rail PTS Sentinel; PTS CCDO; PTS CPCS.

Equipment/Plant Used: 500t mobile crane; concrete cutting equipment including wire, track and hand saws; remote controlled Brokk excavators; 13 tonne and 5tonne excavators.

Case Studies
Bridge Demolition - Abbey Wood

Econ was commissioned to demolish and clear a concrete footbridge spanning a four lane highway. Timing was critical to ensure that disruption to traffic and local residents was kept to a minimum.

READ MORE
Holland Lane East Bridge Demolition

Econ was called in to demolish the Holland Lane East road bridge, which passes over the railway tracks on the Oxted to Edenbridge line. Because of the need to minimise disruption to train services Econ were allowed a 52 hour window of access to the rail and road site and immediate surroundings.

READ MORE
TFL Rolling Stock Disposal

Econ was retained to dismantle and dispose of redundant rolling stock for a number of TfL’s rail subsidiaries, as part of the company’s vital programme of network upgrading and modernisation.

READ MORE
WHAT OUR CLIENTS SAY
We found Econ to be talented and professional. We recently employed them to undertake some regeneration work to help us prepare for the building of our new Queen Elizabeth II Centre. Our experience of working with them was excellent. They were conscientious and efficient when working to a tight deadline and we have no hesitation recommending them for other projects.
read more...
Coram
I have worked with Econ on many projects within London Underground and Network Rail infrastructure. Econ have always been very proactive in their approach to the projects and have worked collaboratively with my teams from the very early stages. I would definitely recommend them to others
read more...
Morgan Sindall
Also evident was the pride the staff have in what they do and the care they take to work safely at all times and offer the best service possible to their clients
read more...
BAE Systems
OUR CHARITY WORK

The Econ team is very active and always looking for ways to raise money for these excellent causes, fielding competitors in challenges such as the London Marathon, the London to Brighton Cycle race and the Killarney Adventure race!

Kent Website Design by SPLAT WEB WORKS